Jackson Boulevard Bridge

View the Jackson Boulevard Bridge photo gallery
Progress of Jackson Boulevard Bridge Donut chart showing percent complete of the current project. Project is 59% complete 59% complete

Jackson Boulevard Bridge features include:

  • Reconstructed bridge and entrance and exit ramps
  • Two eastbound lanes
  • Wider sidewalks on both sides of the street
  • Bike lane in eastbound direction (one-way)
  • I-90/94 entrance ramps are being relocated to eliminate the left side entrance to the expressway