Adams Street and Jackson Boulevard over I-90/94

View the Adams Street and Jackson Boulevard over I-90/94 photo gallery
Progress of Adams Street and Jackson Boulevard over I-90/94 Donut chart showing percent complete of the current project. Project is 95% complete 95% complete

Both bridges opened to traffic on Thursday, December 1.

Adams Street Bridge features include:

  • Reconstructed bridge and entrance and exit ramps
  • Two westbound lanes
  • Wider sidewalks on both sides of the street
  • I-90/94 entrance ramps are being relocated to eliminate the left side entrance to the expressway
  • Installation of a noise abatement wall near Old St. Patrick’s Church

Jackson Boulevard Bridge features include:

  • Reconstructed bridge and entrance and exit ramps
  • Two eastbound lanes
  • Wider sidewalks on both sides of the street
  • Bike lane in eastbound direction (one-way)
  • I-90/94 entrance ramps are being relocated to eliminate the left side entrance to the expressway